Case Studies

Finchampstead

Earthworks and stabilisation on a temporary haulage road

Clipstone Park

Barton provide soil improvements for A556 road

East Kettering Residential Site

Earthwork and civils package to develop Kettering residential

Stanton Cross

Earthworks and civils package for large scale housing dev site

Thurleigh Airfield

Earthworks and soil stabilisation on site at Thurleigh Airfield

A556 Knutsford to Bowden improvements

Barton provide soil improvements for A556 road

Wellingborough enabling works

Haul routes, mitigation ponds and reed beds excavation

John Lewis distribution centre

Enabling work on a 3rd distribution warehouse at MPMK

Rushden Lakes Northamptonshire – Phase 2

Phase 2 development at Rushden Lakes

Wellingborough Crematorium

New Crematorium on the Doddington Road in Wellingborough.

Dudgeon Wind Farm

Enabling works for the construction of Necton wind farm

Woolley Hill Wind Farm

Enabling works for the construction of wind farm